High quality realistic plastic mannequin hand jewelry display with stand for saleGH)
High quality realistic plastic mannequin hand jewelry display with stand for saleGH)
GH
MOQ: 10 pieces
Base Info
Model NO. | GH |
Gender | Female And Male |
Type | Standing |
Color | Customized |
Surface finish | Customized |
Material | Fiberglass,PU,ABS,PC |
Base | Tempering Glass,Metal |
MOQ | 10pcs/style |
Lead time | 15-25 days |
Brand | ArtWing Display |
Quality level | High-end Mid-range |
Port | Shenzhen, China |
Payment Terms | LC, T/T, Western Union |
Specification | Standard package for export |
Product name | High quality realistic plastic mannequin hand jewelry display with stand for sale |
Production Process |
Customized Design
OEM Service
1.Send us one clear picture included all details size(head, bust, waist, and hip etc.), or send us one original sample.
2.Do the mud sculpture or the copy.
3.Arrange to do the original mold and send the sample for the client confirm.
4.Mass production.
After-sale service
1.Two years for quality warranty.
2.Available for 24 hours after-sale service.
All Pantone color workable
The different surface you may like
Different surface finished is workable such as vintage, paper mache,chrome-plated, transparent, fabric or leather wrapped, water transfer, interchangeable face.Same position different feeling.
About us
Display Range |
We provide a wide range of display props.Such as female mannequin, male mannequin, bust form, kids mannequin, torso mannequin head, mannequin hand, butt mannequin, mannequin leg, sewing mannequin, animals, and hangers.
Q: Can I mix products from other China vendors with Art Wing Display in your container?
A: Yes, we can mix other products with Art Wing Display and save your cost.
Q: If I need special color or base, can you do it?
A: Yes, we could paint color and produce base according to your request.
Q: How many workers in Art Wing Display factory?
A: We have two factories in Dongguan, over 350 workers. Welcome to visit us.
Q: How far from Shenzhen airport or Guangzhou airport to our factory?
A: It took about 45 minutes from Shenzhen and about 1 hour from Guangzhou.
Send Your Inquiry Details Pls Click"SEND INQUIRY"Now!